Grange Trunk Water Main

Project Summary

The Grange Trunk Water Main will consist of a 16-inch trunk water main connection between the city’s trunk water supply pipe system on the southeast side of Hamlet Park and the Grange water tower. The addition of this trunk water main connection will provide more consistent water levels in the tower, resulting in more consistent water pressure in the area.

Status

The preliminary survey and geotechnical work needed prior to design of the project is in process.  Design is anticipated to commence in March of 2023, with the project construction scheduled to be completed in 2023.